Aerospace & Defense
The Ministry of Defence awarded RBSL £800 million in May 2021 for 148 Challenger 3 vehicles, near £2 billion across the whole of life....
Hi, what are you looking for?
The Ministry of Defence awarded RBSL £800 million in May 2021 for 148 Challenger 3 vehicles, near £2 billion across the whole of life....
The B-21's average procurement unit cost target was set at about $550,000,000 in 2010 dollars — roughly $750,000,000 today. The program is projected at...
Lockheed built 64 F-117 Nighthawks — 5 development aircraft and 59 production F-117As — in a classified program costing about $6,560,000,000. The Air Force...
Across its whole service life the SR-71 Blackbird accumulated 53,490 flight hours, 11,675 of them above Mach 3, over 17,300 sorties. By the late...
The F-22 Raptor was built to kill an enemy fighter before that fighter knew it was there, at roughly $143,000,000 an aircraft. At the...
In September 2013 the American attack submarine USS Dallas got inside the protective screen around the Royal Navy carrier HMS Illustrious in the Gulf...
The F-22 Raptor was built so that American pilots could kill enemy fighters before those pilots ever saw them, at nearly $143,000,000 per aircraft....
China's Type 039A/B/C Yuan-class is a 3,600-ton diesel-electric attack submarine with air-independent propulsion, 6 533mm torpedo tubes, Yu-6 heavyweight torpedoes and YJ-18 anti-ship cruise...
When the US Navy scuttled the decommissioned carrier USS America in 2005 it took 4 weeks, with no crew aboard and nobody fighting the...
The US Air Force wanted every remaining A-10 Warthog gone in the FY2026 budget cycle — all 162 of them, two years ahead of...